EVM 25W Fast Charger USB-C Adapter with PD Type-C Charger Cable - EVM-CH-013

EVM 25W Fast Charger USB-C Adapter with PD Type-C Charger Cable - EVM-CH-013

White
Sale price  Rs. 1,199.00 INR Regular price Rs. 1,899.00 INR
Skip to product information
EVM 25W Fast Charger USB-C Adapter with PD Type-C Charger Cable - EVM-CH-013

EVM 25W Fast Charger USB-C Adapter with PD Type-C Charger Cable - EVM-CH-013

Sale price  Rs. 1,199.00 INR Regular price Rs. 1,899.00 INR
Taxes included. Shipping calculated at checkout.
ColorWhite

EVM PD 25W Fast Charger - EVM-CH-013

Stay powered up with the EVM PD 25W Fast Charger, designed for fast, safe, and reliable charging. Featuring USB Type-C Power Delivery (PD) technology and a high-quality Type-C to Type-C cable, it delivers efficient charging for compatible smartphones, tablets, and other USB-C devices.

Key Features:
• 25W PD Fast Charging
• USB Type-C Power Delivery Support
• Includes Type-C to Type-C Charging Cable
• Temperature Protection
• Overcurrent Protection
• Compact and Durable Design

Specifications:
• Brand: EVM
• Model: EVM-CH-013
• Type: PD Fast Charger
• Output Power: 25W
• Port: USB Type-C
• Cable Included: Type-C to Type-C Cable
• Fast Charging: Power Delivery (PD) Technology
• Compatibility: Smartphones, Tablets & USB-C Devices
• Protection: Overcharge, Overheat & Short-Circuit Protection
• Country of Origin: India
• Color: White
• MRP: ₹1,899 (Inclusive of All Taxes)

Package Contents:
• 1 x 25W PD Fast Charger
• 1 x Type-C to Type-C Cable

Warranty: 
• 1 Year Manufacturer Defects Warranty

Warranty Description:
1 Year Limited Warranty against manufacturing defects. Warranty does not cover physical damage, misuse, unauthorized repairs, liquid damage, or normal wear and tear. Warranty service is subject to the manufacturer's terms and conditions.

Perfect for everyday fast charging at home, office, or while traveling.

You may also like